- Details
- Category: certificates
- Hits: 989
- Details
- Category: certificates
- Hits: 636
Storm Water Network & Pump Station (Mainline, Branch line, Force mainlines)
1. Trench Excavation
2. Pipe Laying and Testing
3. Backfilling and Restoration Works
4. Construction of Valve Chambers and Installation of Valves.
5. Construction of Pump station including Electro mechanical items.
Sewer Water Network & Pump Station (Mainline, Branch line, Force mainlines)
1. Trench Excavation
2. Pipe Laying and Testing
3. Backfilling and Restoration Works
4. Construction of Valve Chambers and Installation of Valves.
5. Construction of Pump station including Electro mechanical items.
Water Supply Network & Pump Station (Mainline, Branch line)
1. Trench Excavation
2. Pipe Laying and Testing
3. Backfilling and Restoration Works
4. Construction of Valve Chambers and Installation of Valves.
5. Construction of Pump station including Electro mechanical items.
Civil Works
1. Clearing works
2. Cutting and Filling Works
3. Grading Works
Road Works and Asphalting Works
1. Sub grade works
2. Base Course
3. Asphalting Works
4. Curb stones and interlock tiles
5. Milling and re asphalting works